Al Nakhil Field Development, Phase II

The second phase of an onshore oil development: 38 new wells, a second processing train and a produced-water reinjection scheme that lifts the field from 26,000 to 45,000 barrels a day.

Under construction
Field developmentInfill drillingWater injectionOnshore

At a glance

Status
Under construction
Location
Al Nakhil field, Rub' al Khali margin, Oman
Period
2023 — 2027
Our role
Operator, 55% working interest
Plateau production
45,000 bopd
New wells
24 producers, 14 water injectors
Water handling
120,000 bwpd reinjection
First oil, Phase II
Q3 2027 (forecast)
Recoverable reserves
310 million barrels (2P)
Partners
Falaj 55%, two state-backed partners

About the asset

Al Nakhil was discovered in 2009 and brought on stream in 2014 with a single 26,000 barrel-a-day train. Ten years of production history sharpened the reservoir model considerably: the original development left the northern flank under-drained, and pressure support across the main compartment turned out to be weaker than the appraisal wells had suggested.

Phase II answers both problems at once. Twenty-four infill producers target the northern flank and the attic oil left above the original well spacing, while fourteen injectors restore reservoir pressure with treated produced water — which also solves the disposal problem the field would otherwise face as the water cut climbs past 60%.

Associated gas that Phase I flared is now compressed and sent 41 km to the Rish Dune plant, where it is treated and sold. That single change removes roughly 90% of the field's routine flaring and pays for the compression within four years at long-run gas prices.

Scope of work

  • Infill drilling on 380-metre spacing with rotary steerable systems
  • Second 20,000 bopd processing train and stabilisation column
  • Produced-water treatment and reinjection into the aquifer
  • Field gathering network extension — 62 km of flowlines
  • Gas-lift compression and associated-gas capture to Rish Dune
  • Camp expansion, 34 MW of on-site generation and site infrastructure

Upstream

Related assets

All assets

Karat structure, North Caspian basin2025 — 2029

Karat Deep Gas Appraisal

Appraisal of a deep, high-pressure sour gas structure — three wells below 5,200 metres, extended well testing and a development concept study for a resource that may exceed 4 trillion cubic feet.

In developmentDetail