Twenty-two years, from a Muscat engineering office to nineteen operated sites.

Milestones

  • 01

    2004 — Founded in Muscat

    Eleven engineers, one commissioning contract, and a stated intention to take operatorship rather than hand plants over.

  • 02

    2009 — Al Nakhil discovered

    The first operated licence. Discovery well drilled in the Rub' al Khali margin; first oil follows five years later.

  • 03

    2013 — Rish Dune sanctioned

    A shared sour gas plant serving four fields, taken on as operator on behalf of the field partners.

  • 04

    2018 — Into Iraq and the Caspian

    Refining and brownfield engineering opens in Basra governorate; subsurface work begins on the North Caspian margin.

  • 05

    2021 — Emissions put on the production cycle

    Every flare tip at every operated site metered, and the group-wide flaring programme begins from a measured baseline.

  • 06

    2022 — Solar reaches the injection load

    Forty-six megawatts of tracking arrays take over the water injection pumps at three fields.

  • 07

    2026 — Sahil FEED complete

    Front-end design closes on the 1.6 Mtpa polymer complex at Duqm, with investment decision targeted for 2027.